Borkum Riffgrund 2 Offshore High Voltage Substation - 450 MW

Detailed design (partly), procurement, construction, commissioning, load-out, transport and hook-up of a high voltage AC transformer platform. The Offshore Substation will be part of the establishment of the 450 MW Borkum Riffgrund 2 offshore wind farm. The purpose of the Offshore Substation is to collect the electrical energy from the offshore wind farm, transform it to a higher voltage level and deliver the power to shore.

  • LocationGerman North Sea
  • DimensionsTopside 25x40x20 metres
    Jacket 30x30x55 metres
    Piles 63 metres
  • WeightTopside 2500 tonnes
    Jacket 1700 tonnes
    Piles 1050 tonnes
  • Contract AwardApril 2016
  • CompletionSummer 2018
  • ContractEPC
  • ClientØrsted, formerly DONG Energy Wind Power A/S
  • Consultant/EngineerIv-Oil & Gas

 