Work under construction

Blythe Platform

Quarter 2 - 2021 - Independent Oil and Gas PLC (IOG)

Design, engineering, procurement, construction and installation of the Blythe normally unmanned installation (NUI) platform.

 

READ MORE

Southwark Platform

Quarter 2 - 2021 - Independent Oil and Gas PLC (IOG)

Design, engineering, procurement, construction and installation of the Southwark normally unmanned installation (NUI) platform.

 

READ MORE

Borssele Beta Offshore High Voltage Substation - 700 MW

August 2020 - TenneT TSO BV

The Offshore High Voltage Substation (OHVS) Borssele Beta (jacket and topside) is required to link up the wind farms to be built offshore in the South-West section Borssele 3 & 4areas of the Dutch North Sea. HSM Offshore also acquainted the order for Tennet’s first offshore wind energy project, Borssele Alpha (700 MW).

 

READ MORE