Schiehallion FPSO Compression Modules

The Schiehallion FPSO (Floating Production/Storage/Offloading) has two gas-oil-water separation trains, designed for a total capacity of 145,000 barrels of oil per day. Produced gas will be re-compressed and re-injected to enhance recovery and/or disposal back into the reservoir.

 

  • LocationSchiehallion FPSO
  • Dimensions16x14x11 metres
  • Weight700 tonnes
  • Contract AwardJune 1996
  • CompletionApril 1997
  • ContractPC
  • ClientBP
  • Consultant/ EngineerJacobs Engineering (formerly Stork E&C)
  • Subcontract fromJacobs Engineering (formerly Stork E&C)