Detailed engineering, procurement, construction, pre-commissioning, load-out, transport, installation and hook-up of the A18 platform. The jacket and topside consisting of three decks, a helideck and a living quarter for eight persons has been installed in the Northern section of the Dutch continental Shelf, some 300 kilometres North of Den Helder in 44 metres water depth. The gas is exported via a pipeline connection to the nearby A12 production platform.

  • LocationA18, Dutch North Sea
  • DimensionsTopsides 35x25x20 metres
    Jacket 23x26x60 metres
  • WeightTopsides 950 tonnes
    Jacket 1250 tonnes
  • Contract AwardMay 2014
  • CompletionSeptember 2015
  • ContractEPCI
  • ClientPetrogas E&P Netherlands BV
  • Consultant/EngineerIv-Oil & Gas
  • Transport & InstallationSHL