Platforms

A18 Satellite Platform

September 2015 - Petrogas E&P Netherlands BV

Detailed engineering, procurement, construction, pre-commissioning, load-out, transport, installation and hook-up of the A18 platform.

 

READ MORE

E17a-A Platform

July 2009 - Neptune Energy (formerly ENGIE / GDF Suez E&P Nederland BV)

Fabrication of jacket and topsides for the E17a-A field. The topside consists of 4 decks and is equipped with a living quarter and a helideck.

 

READ MORE

Standardised Monotowers

June 2007 - Nederlandse Aardolie Maatschappij bv en Shell UK Ltd.

Framework agreement for the fabrication, procurement, hook-up and commissioning of standardised monotower platforms.

 

READ MORE

J6A Markham Compression/Riser Platform

August 2006 - Spirit Energy (formerly Centrica / CH4 Nederland BV / Venture)

Engineering, procurement, fabrication, load-out and seafastening of a gas compression and riser platform, bridge linked to the existing J6A Markham platform.

 

READ MORE

G17d-AP and K2b-A Topsides

July 2005 - Neptune Energy (formerly ENGIE / GDF Suez E&P Nederland BV)

Fabrication, testing, load-out and seafastening of the topside facilities for the G17d-AP platform and the K2b-A platform.

 

READ MORE

K4BE Satellite Platform

June 2000 - Total E&P Nederland BV

Satellite Platform consisting of topsides, jacket and piles. Topsides include six person emergency accommodation facilities and a helideck.

 

READ MORE