K4-Z HOM and TTAP

May 2013 - Total EPNL

Hang-off module (HOM) for the K4-Z subsea completion tie-in to K5-A. The HOM contains a start-up gas heater and a transportable tanks access platform (TTAP) for K5-A

 

READ MORE

Noise Reduction Tower

October 2001 - NAM

Engineering, procurement, fabrication, load-out and seafastening of a gas compression and riser platform, bridge linked to the existing J6A Markham platform.

 

READ MORE

CALM Buoy and PLEM SSM

May 1996 - BP/Ocensa Columbia

CALM Buoy and PLEM Subsea Manifold, part of Offloading Terminal at Covenas, Columbia. The CALM (Catenary Anchor Leg Mooring) and PLEM (Pipe Line End Manifold) are part of the Offloading Terminal at Covenas and belong tot the Cusiana/Cupiagua field in Columbia.

 

READ MORE

Stinger for MV Solitaire

March 1996 - Allseas Engineering

Space frame for MV Solitaire. The function of the Stinger is to support the maximal 60" pipeline during installation of the line on the seabed.

 

READ MORE

Risers & J-Tubes

November 1986 - Norsk Hydro

Twelve oil risers varying from 300-700 mm, three water injection risers 400-500 mm and 2 x 250 mm OD J-tubes.

 