Rampion Jacket

Procurement and construction of the jacket for the Rampion offshore high voltage substation located near the South coast of the United Kingdom. Waterdepth 24 metres. The capacity of the windpark is 400 MW. Twelve J-tubes for incoming array cables and two J-tubes for export cables are included in the design.

  • LocationRampion, South of Brighton, UK North Sea
  • DimensionsJacket 22,5x18x43 metres
    Piles 38 x dia 2,2 metres
  • WeightJacket 1096 tonnes
    Piles 408 tonnes
  • Contract AwardSeptember 2015
  • CompletionSeptember 2016
  • ContractPC
  • ClientE.ON Climates & Renewables UK
  • Subcontract fromBabcock Marine Ltd

 